page_banner

product

Prefabricated Components

Short Description:

Prefabricated components for gas purification or pure water equipment are specialized elements designed for the construction of facilities dedicated to gas purification or water treatment. These components are manufactured off-site and then assembled at the designated location, offering several benefits for such applications.

For gas purification equipment, prefabricated components may include modular units for gas scrubbers, filters, absorbers, and chemical treatment systems. These components are designed to efficiently remove impurities, contaminants, and pollutants from gases, ensuring that the purified gas meets specific quality standards.

In the case of pure water equipment, prefabricated components can encompass various elements such as modular water treatment units, filtration systems, reverse osmosis units, and chemical dosing systems. These components are engineered to effectively remove impurities, microorganisms, and other substances from water, producing high-quality, potable water.

The use of prefabricated components for gas purification or pure water equipment offers advantages such as accelerated construction timelines, improved quality control, and reduced on-site labor requirements. Additionally, these components can be customized to meet specific project requirements and are often designed to integrate seamlessly with existing infrastructure.

Prefabricated components for gas purification or pure water equipment provide a cost-effective and efficient solution for the construction of facilities dedicated to these critical processes, making them a valuable choice for industries such as manufacturing, pharmaceuticals, semiconductor production, and water treatment plants.


Product Detail

Product Tags

Technological process

1. On site preparation: Ensure the cleanliness of the work area, prepare the necessary tools and equipment, and check the stability of the equipment.

2. Material entry: Sort the materials in an orderly manner according to the drawing requirements, and arrange each component according to their needs to prevent installation errors caused by component misalignment.

3. Welding and connection: Cutting, piping, welding, and installation shall be carried out according to the design requirements of the drawings.

4. Overall assembly: Final assembly according to the diagram.

5. Testing: Appearance, dimensional inspection, and complete airtightness testing.

6. Packaging and labeling: Pack and label according to design requirements.

7. Packing and shipping: Classify packaging and shipping according to demand.

Components photo

prefabricated components1
prefabricated components3

Certificate Of Honor

zhengshu2

ISO9001/2015 Standard

zhengshu3

ISO 45001/2018 Standard

zhengshu4

PED Certificate

zhengshu5

TUV Hydrogen compatibility test certificate


  • Previous:
  • Next:

  • Write your message here and send it to us